AKSA MANAGEMENT

Etapa VI de Reabilitare Drumuri Nationale –Contract de Servicii Lot A - Reabilitare

DN79 Arad – Oradea, km 4+250 – km 107-725 – Contract 6R1

Nr. iesire 6R1 - 07 /18.07.2012

Catre: CNADNR

In atentia: Dl. Mircea POP – Director General

Dna Silvia Ciobanovschi – Sef Proiect UIP NR IFI 2

Dna Mihaela Mocanu – Sef Proiect UIP NR IFI 3

Catre: DRDP Cluj

In atentia: Dl. Gorcea Teodor – Director Adjunct Conducere

Dl. Pantelimon Ion – Director Regional Conducere

Catre: DRDP Timisoara

In atentia: Dl. Ioan Ambrus - Director

Catre: ASTALDI SpA Italia

In atentia: Dl. CARLI ENZO – Project Manager

Proiect: Etapa VI de Reabilitare Drumuri Nationale – Contract de Servicii Lot A - Reabilitare DN79 Arad – Oradea, km 4+250 – km 107-725 – Contract 6R1

Subiect: Mobilizare personal Consultanta

Stimate doamne, Stimati domni,

Urmare adresei Beneficiarului nr. 92/46183/16.07.2012, privind notificarea inceperii serviciilor de consultanta pentru proiectul mentionat mai sus, din data de 16.07.2012, va informam ca personalul Consultantului a fost mobilizat in santier din data de 17.07.2012.

Personalul cheie al Consultantului este detaliat mai jos:Nume PozitieAxinia Florin Sef echipa Nicolescu Cezar Inginer asigurarea calitatiiIonescu Sorin Expert Contracte 1

Page 1 of 2

Page 2: Astaldi - Personal Oradea 2012

AKSA MANAGEMENT

Etapa VI de Reabilitare Drumuri Nationale –Contract de Servicii Lot A - Reabilitare

DN79 Arad – Oradea, km 4+250 – km 107-725 – Contract 6R1

Datele de contact ale biroului principal al Consultantului sunt dupa cum urmeaza:

Adresa: Str. Nufarului, nr. 128, OradeaTel: 0359 467830Fax: 0359 467831

Pentru orice alte informatii, va stam la dispozitie.Cu respect,

Florin Axinia Sef echipa