referinte turnuri de racire si cosuri de fum

Upload: petronela12

Post on 04-Apr-2018

266 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    1/75

    ReferencesPower Generation Industry

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    2/75

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    3/75

    Long-term protection of reinforced concrete structures

    in power plants poses the highest demands on rehabilitation

    and coating systems. Reliability of the structures long-term pro-

    tection is a vital factor that ensures operational reliability of the

    entire power plant.

    Ongoing dialogue with planners and power plant opera-

    tors and MCs own research and development has made the

    company a reliable partner of the energy industry for more than

    40 years when it comes to the protection of their concrete struc-

    tures. Worldwide MC employees are developing project-specic

    solutions, be it for the new construction or repair of cooling

    towers, chimneys and reactor buildings.

    In addition to the vastly differing demands from a struc-

    tural point of view for each and every one of these structures,

    impact from weather conditions which have to be assesseddifferently depending on the respective climate zone, demand

    bespoke system solutions that are tailored to the respective

    overall conditions of the project.

    Complementary to the technical demands of such reha-

    bilitation and surface protection systems, the aesthetic nish

    of the power plants has become another important aspect.

    Here, highly UV-resistant coating systems from MC make it pos-

    sible to achieve complex colour designs.

    This brochure gives you an overview of international

    examples for the use of our system solutions for a diverse range

    of power plant structures.

    Investments of such signicance demand solutions that last!

    Anja SpirresHead of Division Holger SchwarzeProtection Technologies

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    4/754

    Product: Zentricryl RBSYear: 2007

    Projectinformation: Already in 1993 until 1994 one of

    the cooling towers at the nuclear

    power plant Doel was repaired

    on the inside and outside surfaces

    with the tried-and-tested surface

    protection system. Based on years

    of good experiences with the com-

    pany, MC-Bauchemie was again

    called upon in 2006 when the

    reactor building 1 needed to be

    sealed. The particular challenge

    in this case was finding a system

    design with which the negative

    pressure required for operations

    could be achieved in the shortest

    possible time and which could

    maintain this pressure with the

    available aggregates. In this

    instance the system Zentricryl RBS

    was applied.

    Good cooperation resulted in

    further building elements being

    repaired, such as the cooling towersupports, for which Nafufill KM 250

    was used.

    BELGIUM, DOEL

    Nuclear Power PlantDoel

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    5/755

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    6/756

    BELGIUM, RUIEN

    Coal-fired Power PlantRuienProduct: Nafufill KM 250,

    EmceColor-flex

    Year: 2008

    Projectinformation: In 2008 the Nafufill KM 250 system

    was successfully used to repair

    damage to the chimneys.

    The surface protection used in

    this instance was EmceColor-flex.

    Systems from MC-Bauchemie were

    used in repairs of cooling towers

    here as early as the 1990s.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    7/757

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    8/758

    Product: Nafufill KM 250,Zentricryl RBS

    Year: 2008

    Projectinformation: Crack-bridging surface protection

    was required to repair the dam-

    aged exterior shells of this power

    plants cooling towers. Following

    the concrete repair works with

    Nafufill KM 250 the surface protec-

    tion system Zentricryl RBS with its

    high crack-bridging properties was

    therefore used in this case.

    BELGIUM, VILVOORDE

    Cogeneration PlantVilvoorde

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    9/759

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    10/7510

    Product: Zentrifix F 82 XX,MC-DUR 1277 WV,

    MC-DUR VS NR3,

    MC-Schutzberzug 702

    Year: 2008 / 2009

    Projectinformation: In the construction of the new

    cooling tower great emphasis

    was placed on the surface protec-

    tion of the concrete both inside

    and outside right from the start.

    Based on the analysis of the

    expected operational loads an

    important aspect here was the

    feeding of flue gasses into the

    cooling tower for the inside the

    MC-DUR VS NR3 surface protec-

    tion system was chosen, while

    MC-Schutzberzug 702 protected

    the outside shell.

    BULGARIA, GALABOVO

    Coal-fired Power PlantAES-3C Maritsa East 1

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    11/7511

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    12/7512

    Product: MC-DUR 1800 TX,MC-DUR 1200 VK,

    Zentrifix EC 6,

    MC-DUR VS-PUR,

    MC-DUR 1277 WV,

    EmceColor-flex,

    MC-702 SX

    Year: 1992-1996 / 2007

    Projectinformation: After two cooling towers were

    successfully repaired on the inside

    and outside using systems from

    MC during 1992 to 1996, in 2007

    it was the chimney that was refur-

    bished with systems from MC.

    CZECH REPUBLIC, CHVALETICE

    Power Plant Chvaletice

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    13/7513

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    14/7514

    Product: MC-Schutzberzug 702 SX,EmceColor-flex,

    MC-DUR 1277 WV,

    MC-DUR VS NR3,

    MC-DUR VS-PUR

    Year: 2002-2003

    Projectinformation: During 2002 and 2003 a new chim-

    ney was built. In its construction

    MC after-treatment and long-term

    protection systems were applied.

    For more than a decade the cooling

    towers of this plant have been main-tained and repaired with products

    from MC, both inside and outside.

    CZECH REPUBLIC, DETMAROVICE

    Hard-Coal-fired Power PlantDetmarovice

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    15/7515

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    16/7516

    Product: MC-DUR 1277 WV,MC-DUR VS NR3,

    MC-Schutzberzug 702 SX,

    EmceColor-flex

    Year: 1997-1999 / 2005

    Projectinformation: After all four cooling towers were

    successfully protected inside and

    two of them outside using MC pro-

    ducts during 1997 to 1999, the same

    systems were again used in 2005

    for the surface protection of the

    exterior shell of the two remaining

    cooling towers.

    CZECH REPUBLIC, TEMELIN

    Nuclear Power PlantTemelin

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    17/7517

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    18/7518

    Product: Zentrifix F 82 XX,MC-DUR 1277 WV,

    MC-DUR VS NR3

    Year: 2009

    Projectinformation: For the cooling tower with flue

    gas inlet for the new block of

    this power plant near Beijing the

    planner specified systems from

    MC-Bauchemie based on previous

    good cooperation with the com-

    pany. The exterior surface protec-

    tion was also carried out with MC

    products.

    PR CHINA, TIANJIN

    Coal-fired Power PlantJulian Cheng

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    19/7519

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    20/7520

    Product: Zentrifix F 82 XX,MC-DUR VS NR3,

    MC-RIM F

    Year: 2009

    Projectinformation: For the two cooling towers of the

    new power plant powered with

    seawater the client stressed his

    desire for lasting functionality of

    the surface protection as the long

    service life of the plant is para-

    mount. Based on MC-Bauchemies

    experience with similar projects

    (Power Plant Rostock, SAFCO 4,

    Shuaiba 2 and SHARQ3) planners

    and principal opted for MC. This

    also applies to the concrete protec-

    tion for the outer shell. Another

    reason for the successful coopera-

    tion between everyone involved

    was the regular support by MC

    staff onsite.

    PR CHINA, HANGU

    Coal-fired Power PlantBeijiang

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    21/7521

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    22/7522

    Product: Zentrifix F 82 XX,MC-DUR 1277 WV,

    MC-DUR VS NR3,

    MC-Schutzberzug 702

    Year: 2006

    Projectinformation: One of the largest cooling technol-

    ogy service providers in Germany

    recommended systems from MC

    for this project. After intensive

    consultations and the drafting of

    an individual concept MC was

    awarded the contract to supply

    the surface protection systems

    for the inside and the outside of

    the towers.

    The client was not only impressed

    by MCs application technology but

    also by excellent onsite support.

    PR CHINA, BEIJING

    Coal-fired Power PlantHuaneng

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    23/7523

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    24/7524

    Product: Zentricryl RBS,EmceColor-flex S

    MC-DUR 1277 WV

    Year: 2003

    Projectinformation: During the hot summer of 2003 the

    repair of the hybrid cooling tower

    posed a particular challenge. The

    proven system MC-DUR 1277 WV

    was used on the inside. Since high

    loading by vibration caused by

    ventilators is to be expected in this

    cooling tower the highly crack-

    bridging system Zentricryl RBS

    was selected for the outside sur-

    face protection. And due to the

    great heat during that summer the

    intended mineral levelling mortar

    was not used, instead the applica-

    tors were able to fall back on the

    acrylate system Zentrifix CR finish,

    which does not require any after-

    treatment.

    GERMANY, ALTBACH

    Hard-Coal-fired Power PlantAltbach

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    25/7525

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    26/7526

    GERMANY, BERGKAMEN

    Coal-fired Power PlantBergkamenProduct: MC-DUR VS-EW,

    MC-DUR 2103 M,

    MC-FLEX 2098

    Year: 2005

    Projectinformation: The cooling tower had been

    successfully restored inside and

    outside with MC products in the

    1990s, but also needed to be

    toughened up at the chimneys

    opening in 2005.

    Of particular importance in this

    case was to apply a crack-bridging

    surface protection system at the

    mouth of the chimney to comple-

    ment extensive concrete repair

    measures.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    27/7527

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    28/7528

    GERMANY, BEXBACH

    Coal-fired Power PlantBexbachProduct: Zentricryl RBS,

    EmceColor-flex S

    Year: 2004

    Projectinformation: For the outer shell repair works

    of this cooling tower particular

    emphasis was put on the high

    crack-bridging properties of the

    surface protection system. For this

    reason a combination of Zentricryl

    RBS/EmceColor-flex S was used.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    29/7529

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    30/7530

    GERMANY, BIBLIS

    Nuclear Power PlantBiblisProduct: Nafufill KM 124,

    Zentrifix F 92,

    EmceColor-flex

    Year: 1995

    Projectinformation: For the outer repair of the cooling

    towers a crack-bridging system

    was required that was also used at

    the reactor domes. Further building

    components such as the cooling

    tower basin, the office buildings

    and the concrete fence were subse-

    quently repaired with systems from

    MC as well.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    31/7531

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    32/7532

    GERMANY, BOXBERG

    Coal-fired Power PlantBoxbergProduct: Zentrifix F 82 XX,

    MC-DUR 1277 WV,

    MC-DUR VS NR3

    Year: 1998

    Projectinformation: After several older cooling towers

    had already successfully been

    repaired with systems from MC,

    it naturally followed that in the

    construction of the new cooling

    tower Q at the Boxberg power

    plant, a surface protection was

    preventatively applied inside using

    the tried-and-tested systems from

    MC because of the flue gas inlet.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    33/7533

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    34/7534

    GERMANY, BRAUNSCHWEIG

    Cogeneration PlantBraunschweigProduct: Nafufill KM 250,

    MC-DUR 1200 VK,

    MC-DUR VS EW,

    MC-DUR 2103 M,

    MC-FLEX 2099

    Year: 2006

    Projectinformation: After many years of operation the

    top end including the so called

    "down wash area" was partially

    damaged and had to be repaired

    and protected for coming decades

    of maintenance free operation.

    As this building is a landmark for

    its surrounding the colouration of

    the top coating was required in

    best possible quality. In addition

    the top coat MC-DUR 2103 M fulfils

    moderate crack bridging for near

    surface cracks.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    35/7535

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    36/7536

    GERMANY, CHEMNITZ

    Hard-Coal Power PlantChemnitzProduct: Nafufill GTS-HS,

    Zentricryl RBS,

    EmceColor-flex,

    MC-DUR 1277 WV,

    MC-DUR VS NR3

    Year: 2008

    Projectinformation: Preliminary tests found high sul-

    phate content in the concrete of

    the cooler to be repaired, which

    prompted the use of Nafufill

    GTS-HS as concrete replacement

    system. Because of the risk of

    crack formation Zentricryl RBS

    and EnceColor-flex were used on

    the outside. Inside the traditional

    structure with MC-DUR 1277 WV

    and MC-DUR VS NR3 was used.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    37/7537

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    38/7538

    GERMANY, ESSEN

    Waste-to-Energy PlantEssen-KarnapProduct: Zentrifix F 82 XX,

    MC-DUR VS,

    MC-DUR VS-PUR,

    Betonflair

    Year: 1990

    Projectinformation: This chimney, a landmark for the

    Ruhr region, was protected with

    systems from MC-Bauchemie when

    it was newly built.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    39/7539

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    40/7540

    Product: Nafufill GTS,Zentricryl GS 2000,

    EmceColor-flex

    Year: 2005

    Projectinformation: In the case of this chimney it was

    especially important to ensure an

    economical and reliable application

    of the products. By way of consist-

    ently using a levelling mortar on

    acrylate basis that did not require

    any after-treatment the works could

    be completed within the scheduled

    timeframe. In the following year a

    further cooling tower was success-

    fully repaired on the outside based

    on the same system.

    GERMANY, GELSENKIRCHEN

    Coal-fired Power PlantGelsenkirchen-Scholven

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    41/7541

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    42/7542

    GERMANY, GRAFENRHEINFELD

    Nuclear Power PlantGrafenrheinfeldProduct: Zentricryl RBS,

    EmceColor-flex

    Year: 1999 / 2000

    Projectinformation: Following extensive tests and

    sample productions during the

    planning stage in 1998 the reactor

    dome was repaired successfully.

    At a later date the cooling tower

    basin was also sealed.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    43/7543

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    44/7544

    GERMANY, HEILBRONN

    Cogeneration PlantHeilbronnProduct: Nafufill KM 250,

    Betonflair Uniprimer,

    EmceColor-flex

    Year: 2009

    ProjectInformation: The tried-and-tested, crack-bridging

    and vapour-diffusion open system

    EmceColor-flex was used for the

    surface protection of the exterior of

    this cooling tower.

    Due to the condition of the sub-

    strate and based on its good work-

    ability Betonflair Uniprimer was

    applied first.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    45/7545

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    46/7546

    Product: Zentrifix F 82 XX,MC-DUR 1277 WV,

    MC-DUR VS NR3,

    MC-Schutzberzug 702

    Year: 1996 / 1997

    Projectinformation: The chimney was repaired using

    proven systems after having been

    inspected thoroughly. Particularly

    challenging was here the existing

    epoxy resin paint at the opening,

    which could not be removed

    completely. The application was

    adapted jointly with owner,

    planer and applicator to suit the

    local conditions.

    GERMANY, IBBENBREN

    Hard-Coal-fired PowerPlant Ibbenbren

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    47/7547

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    48/7548

    GERMANY, LIPPENDORF

    Lignite-fired Power PlantLippendorfProduct: Zentrifix F82 XX,

    MC-DUR 1277 WV,

    MC-DUR VS NR3

    Year: 2001

    Projectinformation: Preventative surface protection

    for both cooling towers had been

    applied before they were put into

    operation. The interior of the shells

    had been protected against opera-

    tional load impact, in this case a

    mixture of cooling tower plume

    and flue gas condensation. The

    shell exterior was protected against

    the impacts from the atmosphere.

    Each side of the tower shell has a

    surface of approximately 45,000 m.

    After 7 years of more or less unin-

    terrupted operation the coating

    system on the inside of one of the

    two cooling towers was inspected

    by an expert. The inspection report

    certified that under continuous

    operation the service life of the

    surface protection is expected to

    be at least 20 years.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    49/7549

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    50/7550

    Product: Zentricryl RBS,EmceColor-flex

    Year: 2004 / 2008-2009

    Projectinformation: After the cooling tower had been

    successfully repaired with the use

    of MC systems, the restoration of

    the reactor building 2 was realised

    in 2008 and 2009.

    GERMANY, NECKARWESTHEIM

    Nuclear Power PlantNeckarwestheim

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    51/7551

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    52/7552

    GERMANY, NEURATH

    Lignite-fired Power PlantNeurathProduct: Nafufill GTS,

    Zentrifix F 82 XX,

    MC-DUR VS NR3,

    MC-DUR 2203

    Year: 2007-2009

    Projectinformation: During 2007 to 2009 several cool-

    ing towers with flue gas inlets

    were again toughened up using

    new and more effective concepts.

    In this instance, besides the con-

    crete repair particular emphasis

    was placed on a functioning

    interior shell surface protection

    system with sealed off pores,

    which would protect the interior

    effectively until the end of its life-

    span. Of particular importance was

    UV protection above the waistline.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    53/7553

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    54/7554

    Product: Nafufill GTS,Zentrifix F 82 XX,

    MC-DUR VS NR3,

    MC-DUR 2203

    Year: 2007-2009

    Projectinformation: Based on the technical prepara-

    tions and experiences in the power

    plants Weisweiler and Neurath

    newer, more efficient toughening

    concepts were developed for the

    repair of the interior shell. After the

    cooling towers of this power plant

    had during the 1990s already been

    protected against the aggressive

    impact of the flue gases fed in, MC

    systems were again applied in this

    repair measure.

    GERMANY, NIEDERAUSSEM

    Lignite-fired Power PlantNiederauem

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    55/7555

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    56/7556

    GERMANY, ROSTOCK

    Hard-Coal-fired Power PlantRostockProduct: Zentrifix F 82 XX,

    MC-DUR VS NR3,

    MC-Schutzberzug 702

    Year: 1992

    Projectinformation: This power plant was the first

    new-built power plant in the new

    federal states after reunification.

    It is also the first power plant in

    Germany where the cooling tower

    is operated by sea-water (other

    power plants with this technology

    started operations in Saudi Arabia

    and in Kuwait between 2002 and

    2008). Another important consider-

    ation is the fact that the operation

    uses flue gas inlets here as well.

    Due to the heavy load impact that

    this entails surface protection with

    systems from MC-Bauchemie

    became necessary.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    57/7557

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    58/7558

    GERMANY, SPREMBERG

    Lignite-fired Power PlantSchwarze PumpeProduct: Zentrifix F 82 XX,

    MC-DUR VS NR3,

    MC-Schutzberzug 702

    Year: 1994-1995

    Projectinformation: In the new construction of blocks

    A and B of the brown-coal-fired

    power plant Schwarze Pumpe

    effective concrete protection for

    the interior shell was included in

    the planning right from the start

    because of flue gas inlets; this was

    performed using the MC systems

    MC-Schutzberzug 702 (outside)

    and MC-DUR VS NR3 (inside).

    An overhaul of the interior surfaces

    above the waistline was carried out

    in 2009 for one of the towers, the

    second cooling tower is planned

    to also receive a cover coat with

    UV-resistant polyurethane in 2010.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    59/7559

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    60/7560

    Product: Nafufill GTS,Zentrifix F 82 XX,

    MC-DUR VS NR3,

    MC-DUR 2203

    Year: 2007-2009

    Projectinformation: Because of intensive operational

    loading of the cooling towers with

    flue gas inlets damages occurred

    despite several surface protection

    measures having been carried out

    during the 80s and 90s. A com-

    pletely new concept of repair and

    surface protection including partial

    static strengthening was therefore

    developed by a team of experts,

    with instrumental support from

    MC-Bauchemie. As a result all

    cooling towers of the power plant

    (amongst them block G) are being

    toughened with systems from MC.

    GERMANY, WEISWEILER

    Lignite-fired Power PlantWeisweiler

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    61/7561

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    62/7562

    Product: MC-DUR 1277 WV,MC-FLEX 2099,

    MC-DUR VS NR3,

    MC Schutzberzug 702

    Year: 2008-2009

    Projectinformation: After several cooling towers and

    chimneys of the existing power

    plant were already repaired suc-

    cessfully with MC products during

    the 1990s, MC products were again

    used in the new construction of

    another cooling tower.

    Additionally, special colours were

    required for the design of the exte-

    rior shell.

    POLAND, BELCHATOW

    Lignite-fired Power PlantBelchatow

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    63/7563

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    64/7564

    POLAND, KATOWICE

    Power Plant Laziska

    Product: Zentrifix KMH,Nafufill KM 250,

    MC-DUR 1277 WV,

    MC-DUR VS NR3,

    MC-DUR VS-PUR

    Year: 2008

    Projectinformation: For this cooling tower it was par-

    ticularly important to repair the shor-

    ing in the water distribution level

    and the cooling tower basin. First of

    all the concrete was repaired using

    the tried-and-tested Nafufill KM 250

    system, followed by the surface

    protection system MC-DUR VS NR3

    combined with MC-DUR VS-PUR.

    Both chimneys were also repaired

    in this power plant, for which MCs

    surface protection systems matched

    to the respective load scenarios

    were used.

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    65/7565

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    66/7566

    Product: Zentrifix KMH,Zentrifix GM2,

    MC-DUR 1277 WV,

    MC-DUR VS

    MC-Schutzberzug 702 SX,

    Betonflair W

    Year: 1998

    Projectinformation: In this plant the cooling tower was

    successfully repaired with MC

    products on the inside and outside.

    Whats worth mentioning here is

    that the colour design for the outer

    surface was done by the children

    from the primary school in Opole.

    POLAND, OPOLE

    Power Plant Opole

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    67/7567

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    68/7568

    Product: Nafufill KM 250,Betonflair Uniprimer,

    EmceColor-flex,

    MC-DUR 1277 WV,

    MC-DUR VS NR3,

    MC-CFK Sheets

    Year: 2007-2009

    Projectinformation: Following extensive inspections

    that identified a rather thin con-

    crete cover it was decided to repair

    one cooling tower of this power

    plant with the PCC mortar Nafufill

    KM 250, which is statically creditable.

    Surface protection was then applied

    with the EmceColor-flex system.

    The inside surface was also repaired

    and was protected with the proven

    system MC-DUR VS NR3. Of great

    importance in this case was the

    static strengthening of the cooling

    towers with MC-CFK sheets.

    Another special feature was the col-

    our design, luminous rings painted

    with RAL 3000.

    ROMANIA, IERNUT

    Power Plant Iernut

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    69/7569

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    70/7570

    Product: MC-Schutzberzug 702,MC-DUR VS,

    MC-DUR VS-PUR

    Year: 2007

    Projectinformation: In this project during new con-

    struction the proven products

    from MC-Bauchemie were also

    being used. The deciding factor

    here was the possibility of concrete

    after-treatment in slip form con-

    struction with integrated long-term

    protection.

    RUSSIA, RYAZAN

    Power Plant Ryazan

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    71/7571

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    72/7572

    Product: MC-Schutzberzug 702Year: 2008

    Projectinformation: Recoating of the smoke band to

    provide protection from chemical

    attack and to create an aesthetically

    pleasing finish. MC-Schutzberzug

    702 was selected as this product

    provides very short drying times

    between coats a requirement

    in order to minimise moving the

    access platforms.

    UNITED KINGDOM, FAWLEY

    Petrochemical ManufacturingPlant ExxonMobil

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    73/7573

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    74/75

  • 7/29/2019 Referinte Turnuri de Racire Si Cosuri de Fum

    75/75