Download - Deviz General Drumuri Pietrari Sipot
ANEXA NR 5 - DEVIZ GENERAL
PRIVIND CHELTUIELILE NECESARE REALIZARII: MODERNIZARE DC 139 A SIPOT - VULCANA BAI COM. PIETRARI
IN MII LEI/MII € LA CURSUL LEI/€ 4,2065 LEI=1 € LA DATA DE 11/03/2011
NR CRT
DENUMIREA CAPITOLELOR SI VALOARE (FARA TVA) TVA VALOARE (INCLUSIV TVA)
SUBCAPITOLELOR DE CHELTUIELI MII LEI MII EURO MII LEI MII LEI MII EURO
1 2 3 4 5 6 7
CAPITOLUL 1: CHELTUIELI PENTRU OBTINEREA SI AMENAJAREA TERENULUI
1.1 Obtinerea terenului
SUBTOTAL 1.1 0.000 0.000 0.000 0.000 0.000
1.2 Amenajarea terenului
SUBTOTAL 1.2 0.000 0.000 0.000 0.000 0.000
1.3 Amenajari pentru protectia mediului si aducerea la starea initiala
SUBTOTAL 1.3 0.000 0.000 0.000 0.000 0.000
TOTAL CAPITOLUL 1 0.000 0.000 0.000 0.000 0.000
CAPITOLUL 2: CHELTUIELI PENTRU ASIGURAREA UTILITATILOR NECESARE OBIECTIVULUI
2.1Retele, utilitati
SUBTOTAL 2.1 0.000 0.000 0.000 0.000 0.000
TOTAL CAPITOLUL 2 0.000 0.000 0.000 0.000 0.000
CAPITOLUL 3: CHELTUIELI PROIECTARE SI ASISTENTA TEHNICA
3.1 Studii teren
Studii topo 12.000 2.853 2.880 14.880 3.537
studii geo 1.400 0.333 0.336 1.736 0.413
SUBTOTAL 3.1 13.400 3.186 3.216 16.616 3.950
3.2 Taxe pentru avize, acorduri si autorizatii
avize si acorduri 3.000 0.713 0.000 3.000 0.713
SUBTOTAL 3.2 3.000 0.713 0.000 3.000 0.713
3.3 Proiectare si inginerie maxim 3 % x cap 4
proiectare SF 13.000 3.090 3.120 16.120 3.832
proiectare PT+CS+DE 26.000 6.181 6.240 32.240 7.664
expertiza tehnica 1.500 0.357 0.360 1.860 0.442
verificare proiect 2.000 0.475 0.480 2.480 0.590
SUBTOTAL 3.3 42.500 10.103 10.200 52.700 12.528
3.4 Organizarea procedurilor de achizitie
proceduri de achizitie 2.000 0.475 0.480 2.480 0.590
SUBTOTAL 3.4 2.000 0.475 0.480 2.480 0.590
3.5 Consultanta
consultanta maxim 1 % x cap 4 18.666 4.437 4.480 23.146 5.502
SUBTOTAL 3.5 18.666 4.437 4.480 23.146 5.502
3.6 Asistenta tehnica maxim 1.5 % x cap 4
Asistenta tehnica 18.666 4.437 4.480 23.146 5.502
supraveghere lucrari 9.333 2.219 2.240 11.573 2.751
SUBTOTAL 3.6 27.999 6.656 6.720 34.719 8.254
TOTAL CAPITOLUL 3 107.566 25.571 25.096 132.662 31.537
CAPITOLUL 4: CHELTUIELI PENTRU INVESTITIA DE BAZA
4.1 Constructii si instalatii
OB 1 - LUCRARI DE DRUMURI 1,739.433 413.511 417.464 2,156.897 512.753
OB 2 - PODETE 27.000 6.419 6.480 33.480 7.959
OB 3 – DR LATERALE +INTERSECTII 100.197 23.820 24.047 124.244 29.536
SUBTOTAL 4.1 1,866.630 443.749 447.991 2,314.621 550.249
4.2 Montaj utilaje tehnologice
SUBTOTAL 4.2 0.000 0.000 0.000 0.000 0.000
4.3 Utilaje, echipamente tehnologice functionale cu montaj
SUBTOTAL 4.3 0.000 0.000 0.000 0.000 0.000
4.4 Utilaje fara montaj si echipamente de transport
SUBTOTAL 4.4 0.000 0.000 0.000 0.000 0.000
4.5 Dotari
SUBTOTAL 4.5 0.000 0.000 0.000 0.000 0.000
4.6 Active necorporale
SUBTOTAL 4.6
TOTAL CAPITOLUL 4 1,866.630 443.749 447.991 2,314.621 550.249
5.1 Organizare de santier
5.1.1 Lucrari de constructii 1.5 % X C+M 27.999 6.656 6.720 34.719 8.254
5.1.2 Cheltuieli conexe org de santier 0,5 % X C+M 9.333 2.219 2.240 11.573 2.751
SUBTOTAL 5.1 37.333 8.875 8.960 46.292 11.005
5.2 Comisioane, cote, taxe, costul creditului
Cote ISC 0.8 % X C+M 15.157 3.603 0.000 15.157 3.603
Comision CSC 0.5 % X C+M 9.473 2.252 0.000 9.473 2.252
Costul creditului 35 % (cap 3 + cap 4 + cap 5.1 + cap 5.3) 773.132 183.795 185.552 958.683 227.905
SUBTOTAL 5.2 797.762 189.650 185.552 983.314 233.761
5.3 Cheltuieli diverse si neprevazute
Cheltuieli diverse si neprevazute 10 % (cap 3 + cap 4) 197.420 46.932 47.381 244.800 58.196
SUBTOTAL 5.3 197.420 46.932 47.381 244.800 58.196
TOTAL CAPITOLUL 5 1,032.514 245.457 241.892 1,274.406 302.961
CAPITOLUL 6: CHELTUIELI PENTRU PROBE TEHNOLOGICE SI TESTE SI PREDARE LA BENEFICIAR
6.1 Pregatirea personalului de exploatare
SUBTOTAL 6.1
6.2 Probe tehnologice si teste
SUBTOTAL 6.2
TOTAL CAPITOLUL 6
TOTAL DEVIZ GENERAL 3,006.710 714.777 714.979 3,721.689 884.747
TOTAL C+M 1,894.629 450.405 454.711 2,349.341 558.502
PROIECTANT,
ANEXA NR 6 - DEVIZUL OBIECTULUI 1 - LUCRARI DE DRUMURI
IN MII LEI/MII € LA CURSUL LEI/€ 4,2065 LEI=1 € LA DATA DE 11/03/2011
NR CRT
DENUMIREA CAPITOLELOR SI VALOARE (FARA TVA) TVA VALOARE (INCLUSIV
TVA)
SUBCAPITOLELOR DE CHELTUIELI MII LEI MII EURO MII LEI MII LEI MII EURO
1 2 3 4 5 6 7
I - LUCRARI DE CONSTRUCTII
DC 139 A 1,739.433 413.511 417.464 2,156.897 512.753
TOTAL CAPITOLUL 1 1,739.433 413.511 417.464 2,156.897 512.753
II - MONTAJ
montaj utilaj 0.000 0.000 0.000 0.000 0.000
TOTAL CAPITOLUL 2 0.000 0.000 0.000 0.000 0.000
III - Procurare
utilaje 0.000 0.000 0.000 0.000 0.000
dotari 0.000 0.000 0.000 0.000 0.000
TOTAL CAPITOLUL 3 0.000 0.000 0.000 0.000 0.000
TOTAL (1 + 2 +3) 1,739.433 413.511 417.464 2,156.897 512.753
PROIECTANT,
ANEXA NR 6 - DEVIZUL OBIECTULUI 2 - PODETE
IN MII LEI/MII € LA CURSUL LEI/€ 4,2065 LEI=1 € LA DATA DE 11/03/2011
NR CRT
DENUMIREA CAPITOLELOR SI VALOARE (FARA TVA) TVA VALOARE (INCLUSIV
TVA)
SUBCAPITOLELOR DE CHELTUIELI MII LEI MII EURO MII LEI MII LEI MII EURO
1 2 3 4 5 6 7
I - LUCRARI DE CONSTRUCTII
DC 139 A 27.000 6.419 6.480 33.480 7.959
TOTAL CAPITOLUL 1 27.000 6.419 6.480 33.480 7.959
II - MONTAJ
montaj utilaj 0.000 0.000 0.000 0.000 0.000
TOTAL CAPITOLUL 2 0.000 0.000 0.000 0.000 0.000
III - Procurare
utilaje 0.000 0.000 0.000 0.000 0.000
dotari 0.000 0.000 0.000 0.000 0.000
TOTAL CAPITOLUL 3 0.000 0.000 0.000 0.000 0.000
TOTAL (1 + 2 +3) 27.000 6.419 6.480 33.480 7.959
PROIECTANT,
ANEXA NR 6 - DEVIZUL OBIECTULUI 3 - DRUMURI LATERALE + INTERSECTII
IN MII LEI/MII € LA CURSUL LEI/€ 4,2065 LEI=1 € LA DATA DE 11/03/2011
NR CRT
DENUMIREA CAPITOLELOR SI VALOARE (FARA TVA) TVA VALOARE (INCLUSIV
TVA)
SUBCAPITOLELOR DE CHELTUIELI MII LEI MII EURO MII LEI MII LEI MII EURO
1 2 3 4 5 6 7
I - LUCRARI DE CONSTRUCTII
DC 139 A 100.197 23.820 24.047 124.244 29.536
TOTAL CAPITOLUL 1 100.197 23.820 24.047 124.244 29.536
II - MONTAJ
montaj utilaj 0.000 0.000 0.000 0.000 0.000
TOTAL CAPITOLUL 2 0.000 0.000 0.000 0.000 0.000
III - Procurare
utilaje 0.000 0.000 0.000 0.000 0.000
dotari 0.000 0.000 0.000 0.000 0.000
TOTAL CAPITOLUL 3 0.000 0.000 0.000 0.000 0.000
TOTAL (1 + 2 +3) 100.197 23.820 24.047 124.244 29.536
PROIECTANT,
MODERNIZARE DC 139 A – SIPOT– VULCANA BAI in comuna Pietrari , jud. Dambovita L = 3,219 m
platforma = 5,00 m; carosabil = 4,00m
4.1 Lucrari de drumuri
Nr. crt.
Denumire articol
U/M Cantitate Pret UM/lei
Valoare lei
1
4.1.1
Sistem Rutier
Terasamente (umplut + sapaturi )
mc 2.906,00 30,00 87.180,00
2 Fundatii din balast mc 1.617,50 38,00 61.465,00
3 Strat balast amestec optimal mc 1.943,40 44,00 85.509,60
4 Strat de legatura mixtura AB2 to 2.111,82 301,00 635.657,82
5 Strat de uzura BAR 16 to 1.243,78 320,00 398.009,60
6 Acostamente consolidate ( balast stabilizat)
mc 482,85 200,00 96.570,00
7
Lucrari accesorii
Indic. de circulatie buc 17,00 280,00 4.760,00
8 Marcaje rutiere km 3.129 640,00 2.002,56
9 Parapet protectie ml - - -
10 Borne km si hm buc 32,00 41,00 1.312,00
11 4.1.2 Santuri Santuri pereate mp 9.657,00 38,00 366.966,00
TOTAL ( EXCLUSIV TVA ) 1.739.432,58
ob. 4.1.3 Podete
1 Podete tub ø 500 mm ml 60 450,00 27.000,00
2 Podete tub ø 800 mm ml - - -
TOTAL ( EXCLUSIV TVA ) 27.000,00
ob. 4.1.4 Drumuri laterale + intersectii ( 9 buc. )
1 Terasamente mc 122,40 30,00 3.672,00
2 Fundatii din beton mc 122,40 38,00 4.651,20
3 Strat balast amestec optimal mc 149,85 44,00 6.593,40
4 Strat de legatura mixtura AB2 to 177,11 301,00 53.310,11
5 Strat de uzura BAR 16 to 95,90 320,00 30.688,00
6 Acostamente ( balast ) mc 33,75 38,00 1.282,50
TOTAL ( EXCLUSIV TVA ) 100.197,21