FIBRE OPTIC CABLE (FOC) RFI
RFI NO QCP NO ITP NO QC CODE TEST MDT CODE ITEM TO BE INSPECTED AREA / LOCATION REF. DRAW
1
LT-TL-001 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD
2
LT-TL-002 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD
3
LT-TL-003 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD
4
LT-TL-004 TL-5101 TL-5101-01 01
Fibre Optic Cable Installation KP 105+800 to KP 102+100
5
LT-TL-005 TL-5102 TL-5102-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD
6
LT-TL-006 TL-5101 TL-5101-01 01
KP 107+845 to KP 105+800
7
LT-TL-007 TL-5101 TL-5102-02 02 MO/LF/SLPC/111-2
KP 107+626 to KP 102+100
8
LT-TL-008 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGS-5TCF STOREYARD
9
LT-TL-009 TL-5101 TL-5101-01 01
KP 106+050 to KP 104+400
10
LT-TL-010 TL-5101 TL-5101-01 01
KP 102+171 to KP 101+200
11
LT-TL-011 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGS-5TCF STOREYARD
12
13
LT-TL-012 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGS-5TCF STOREYARD
14
LT-TL-013 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD
15
LT-TL-014 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD
16
LT-TL-015 TL-5101 TL-5101-01 01
KP 104+400 to KP 103+400
ABU DHABI GAS DEVELOPMENT COMPANY L
SHAH-5 Package Pipeline Project
SL.NO.
CertificateNo.
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPPP05-0500-21-SC
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPPP05-0500-15-SPPP05-0500-89-MP
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPPP05-0500-15-SPPP05-0500-89-MP
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
PP05-0500-23-SCPP05-0500-23-SP
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fiber Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SCPP05-0500-23-SP
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
. 557355-IR-002-PLF-0000
Fiber Optic cable Drum Installation afterpre-padding
PP05-0500-23-SCPP05-0500-23-LAYPP05-0500-23-ST0500-STD-1020 R
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic cable Test after post paddingprior to backfilling
PP05-0500-23-SCPP05-0500-23-LAYPP05-0500-23-SPPP05-0500-23-ST
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPPP05-0500-21-SC
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
Fibre Optic Cable installation after
padding in Trench 1
PP05-0500-23-SCPP05-0500-23-LAY
PP05-0500-23-ST0500-STD-1020 R
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
Fibre Optic Cable installation afterpadding in Trench 2
PP05-0500-23-SCPP05-0500-23-LAYPP05-0500-23-ST0500-STD-1020 R
PP05-0500-92-PLN-
2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPPP05-0500-21-SC
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPPP05-0500-21-SC
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPPP05-0500-21-SC
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPPP05-0500-21-SC
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
Fibre Optic Cable installation afterpadding in Trench 2
PP05-0500-23-SCPP05-0500-23-LAYPP05-0500-23-ST0500-STD-1020 R
-
8/2/2019 Foc Rfi Details
2/3
FIBRE OPTIC CABLE (FOC) RFI
RFI NO QCP NO ITP NO QC CODE TEST MDT CODE ITEM TO BE INSPECTED AREA / LOCATION REF. DRA
ABU DHABI GAS DEVELOPMENT COMPANY
SHAH-5 Package Pipeline Project
SL.NO.
CertificateNo.
19
LT-TL-018 TL-5101 TL-5101-01 01
KP 103+400 to KP 102+400
20
LT-TL-019 TL-5101 TL-5101-01 01
KP 102+400 to KP 101+400
21
LT-TL-020 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD
22
LT-TL-021 TL-5101 TL-5101-01 01
KP 101+400 to KP 100+230
23
LT-TL-022 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
KP 107+626 to 100+230
24
LT-TL-023 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
KP 100+200 to 102+100
25
LT-TL-024 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD
26
LT-TL-025 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD
27
LT-TL-026 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
KP 107+845 to 102+200
28
LT-TL-027 TL-5101 TL-5101-01 01
KP 107+626 to KP 107+900
29
LT-TL-028 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD
30
LT-TL-029 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD
31
LT-TL-030 TL-5101 TL-5101-01 01
KP 94+640 to KP 91+330
32
LT-TL-031 TL-5101 TL-5101-01 01
KP 94+660 to KP 93+000
33
LT-TL-032 TL-5101 TL-5101-01 01
KP 94+660 to KP 93+000
34
LT-TL-033 TL-5101 TL-5101-01 01
KP 91+330 to KP 88+000
35
LT-TL-034 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
KP 107.845 to KP 102.200
36 KP 94+640 to 88+000 PP05-0500-23-S
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
Fibre Optic Cable installation afterpadding in Trench 2
PP05-0500-23-SPP05-0500-23-LPP05-0500-23-S
0500-STD-1020
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
Fibre Optic Cable installation afterpadding in Trench 2
PP05-0500-23-SPP05-0500-23-LPP05-0500-23-S0500-STD-1020
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPP05-0500-21-S
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
Fibre Optic Cable installation afterpadding in Trench 2
PP05-0500-23-SPP05-0500-23-LPP05-0500-23-S0500-STD-1020
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable test after post paddingprior to backfilling (Trench 2)
PP05-0500-23-SPP05-0500-23-S
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable test after post paddingprior to backfilling (Trench 1)
PP05-0500-23-SPP05-0500-23-S
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPP05-0500-21-S
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103.SH.1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPP05-0500-21-S
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable test after post paddingprior to backfilling (Trench 1)
PP05-0500-23-SPP05-0500-23-S
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
Fibre Optic Cable installation afterpadding in Trench 1
PP05-0500-23-SPP05-0500-23-LPP05-0500-23-S0500-STD-1020
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPP05-0500-21-S
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-23-SPP05-0500-21-S
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
Fibre Optic Cable installation afterpadding in Trench 2 (Pipe side)
PP05-0500-23-SPP05-0500-23-LPP05-0500-23-S0500-STD-1020
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
Fibre Optic Cable installation afterpadding in Trench 1 (Road Side)
PP05-0500-23-SPP05-0500-23-LPP05-0500-23-S0500-STD-1020
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
Fibre Optic Cable installation after
padding in Trench 1 (Road Side)
PP05-0500-23-SPP05-0500-23-L
PP05-0500-23-S0500-STD-1020
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5102SH. 1
557355-IR-002-PLF-0000
Fibre Optic Cable installation afterpadding in Trench 2 (Pipe Side)
PP05-0500-23-SPP05-0500-23-LPP05-0500-23-S0500-STD-1020
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable test after post paddingprior to backfilling (Trench 2)
PP05-0500-23-SPP05-0500-21-S
PP05 0500 92 PLN MDT TL CDQ 5103
Fibre Optic Cable test after post paddingprior to backfilling (Trench 2)
-
8/2/2019 Foc Rfi Details
3/3
FIBRE OPTIC CABLE (FOC) RFI
RFI NO QCP NO ITP NO QC CODE TEST MDT CODE ITEM TO BE INSPECTED AREA / LOCATION REF. DRAWING NOS.
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH-5 Package Pipeline Project
INSTRUMENT RFI ST
SL.NO.
CertificateNo.
DATE OFISSUED
DATE INPE
40
LT-TL-039 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD PP05-0500-21-SCH-9727
02/25/2012 02/26/2012
41
LT-TL-040 TL-5102 TL-5101-02 02 MO/LF/SLPC/111-2
SGD-5TCF STOREYARD PP05-0500-21-SCH-9727
02/27/2012 02/28/2012 t
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation
PP05-0500-92-PLN-2653
MDT.TL.CDQ.5103SH. 1
Fibre Optic Cable Drum Testing prior toInstallation