cvg1 cu3 cg3 uat satu mare · subtraversare podet (sv2) cu foraj orizontal dirijat, pentru conducta...

Post on 17-Sep-2019

13 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

U

A

T

D

O

B

A

U

A

T

S

A

T

U

M

A

R

E

SATMAREL

Tronson I - Camin existent Satmarel (AD1) -

Racord GA Gelu (N28)

Tronson I - Camin existent Satmarel (AD1) -

Racord GA Gelu (N28)

Tronson I - Camin existent Satmarel (AD1) -

Racord GA Gelu (N28)

UAT SATU MARE

Supratraversare rau Homorodul Vechi (SPR1), pentruconducta de aductiune din PEID, PE100, De 315 mm

termoizolata, L = 23.5 m

Subtraversare podet (SV1) cu foraj orizontaldirijat, pentru conducta de aductiune apa potabiladin PEID, PE100, De315 mm in tub de protectie

din OL Dn508x7,9mm, L=6,0 m

Subtraversare podet (SV2) cu foraj orizontaldirijat, pentru conducta de aductiune apa

potabila din PEID, PE100, De315 mm in tubde protectie din OL Dn508x7,9mm, L=5,0 m

Subtraversare drum (SDA1) prin sapaturadeschisa, pentru conducta de aductiune apa

potabila din PEID, PE100, De315 mm in tub deprotectie din OL Dn508x7,9mm, L=14,50 m

Cu1

Cu3

Cu4

Cu7

CVG1

CA2

Ht1

CG5

CVG3

CG4

CVA1

CA1

CG1

CVG2

CG2

CG3

CA3

Ht2

P

E

I

D

P

N

1

6

D

e

3

1

5

m

m

PE

ID

P

N16 D

e315 m

m

PE

ID

P

N16 D

e315 m

m

P

E

I

D

P

N

1

6

D

e

3

1

5

m

m

Subtraversare viroaga (SV3) prin sapatura deschisa, pentru conductade aductiune apa potabila din PEID, PE100, De315 mm in tub de

protectie din OL Dn508x7,9mm, L=7,0 m

VA1

Tronson I - Camin existent Satmarel (AD1) -

Racord GA Gelu (N28)

P

E

I

D

P

N

1

6

D

e

3

1

5

m

m

AD1

AD1'

AD1''

D

J

1

9

4

.

2

D

J

1

9

4

.2

D

J

1

9

4

.2

D

J

1

9

4

.

2

D

J

1

9

4

.

2

N15

LEGENDA SITUATIA PROIECTATA:

LEGENDA SITUATIA EXISTENTA:

Limita UAT

Camin cu robinet de sectionare si golireCVG

Camin de aerisire CACamin cu robinet de sectionare si aerisireCVA

Camin masurare a debitelorCMDCamin uscatCu

Camin cu robinet de sectionare CVCamin de golire CG

Subtraversari

Camin de observatieCco

Conducta de aductiune apa bruta / potabila - extindereImprejmuire

VA Ventil de aerisire-dezaerisire

Supratraversari

Nod de delimitare Strazi / Tronsoane N275

Linie de racordare cuSM - CL2.1 - SF - SS - AC - PG - 002

SM-CL2.1-SF-SS-AC-PG-001

SCHEMA PLANSELOR

SM-CL2.1-SF-SS-AC-PG-002

SM-CL2.1-SF-SS-AC-PG-003SM-CL2.1-SF-SS-AC-PG-004

SM-CL2.1-SF-SS-AC-PG-005

SM-CL2.1-SF-SS-AC-PG-006

SM-CL2.1-SF-SS-AC-PG-007

SM-CL2.1-SF-SS-AC-PG-008

SM-CL2.1-SF-SS-AC-PG-009

SM-CL2.1-SF-SS-AC-PG-010

REGIONAL DEVELOPMENT PROJECT OF WATER AND WASTEWATER INFRASTRUCTUREIN SATU MARE COUNTY / NORTH - WEST REGION, IN 2014 - 2020

Proiect:Project:

Beneficiary:Beneficiar:

Designer:Proiectant:

REGIONAL DE DEZVOLTARE A INFRASTRUCTURII DE APASI APA UZATA DIN JUDETUL SATU MARE / REGIUNEA NORD - VEST, IN PERIOADA 2014 - 2020

S.C. APASERV SATU MARE S.A.

ROMAIR CONSULTING S.R.L.

Designed / ProiectatDrawn / DesenatProject Manager / Sef proiect imprumutarea documentatiei fara aprobarea

It is prohibited to copy, multiply or print thisdocument without written approval of ROMAIR

scrisa a ROMAIR CONSULTING

Scale / Scara: Date / Data: Phase / Faza:1:5000 Feasibility Study

Cod proiect / Project code:

513-13-16/04.2015

CONSULTINGEste interzisa copierea, multiplicarea si

Revision no./Date / Revizia nr./Data : Object of the revision / Obiectul reviziei: Signature / Semnatura:

Large Infrastructure Operational Programme 2014 - 2020Programul Operational Infrastructura Mare 2014 - 2020

Corp 3 parter,Corp 3 etaj 1, si birourile 3, 4, 5 si 6 din Corp 5 etaj 3

Drawing No. / Nr.desen:

SM-CL2.1-SF-SS-AC-PG-001

R1

r Iunie/June2018

ing. Emilia Timofte

ing. Emilia Timofte

ing. Alexandru Pavel

top related