1 01 reparatii cabine f3 lista cantitati

4
SECTIUNEA TEHNICA SECTIUNEA Nr. Capitol de lucrari U.M. Cantitatea 0 1 2 3 4 1 mp 60.00 33.01 material: 23.47 manopera: 9.35 utilaj: 0.19 transport: 0.00 1.1 ora 0.24 48.00 1.2 kg 324.00 4.10 2 MP 65.00 72.94 material: 62.49 manopera: 10.45 utilaj: 0.00 transport: 0.00 2.1 MP 68.25 0.00 2.2 BUCATA 84.50 2.25 2.3 mp 68.25 3.64 2.4 mp 66.95 12.05 3 mp 65.00 2.18 material: 0.00 manopera: 2.18 utilaj: 0.00 transport: 0.00 4 mc 2.42 258.32 material: 232.41 manopera: 12.43 utilaj: 13.48 transport: 0.00 5 tona 4.91 9.75 material: 0.00 manopera: 0.00 utilaj: 0.00 transport: 9.75 6 tona 2.00 12.75 material: 0.00 manopera: 0.00 utilaj: 0.00 transport: 12.75 TOTAL 1 (Cheltuieli directe) Greutate Materiale (tone) Ore Manopera Material Manopera Utilaj Transport Formular F3 Lista cu cantitati de lucrari pe categorii de lucrari Pretul unitar (fara TVA) - Lei - CF07B# - Tencuieli interioare,subtiri (1CM), tinci, exec manual 3817 - Malaxor pt.mortar,actionat electric,200 L 500007171 - Tinci pe baza de var-ciment NLTS02A - Tavane suspendate,OSB,1X12.5MM, mont.pe schelet metalic de sustinere suspend.elem.tip nonius 7801675 - Placa osb 8658134 - Element sup.de suspendare+ancora cd- nonius 7800027 - Plasa din fibra de sticla 2602345 - Placa polistiren extrudat at-N5 2 MM.gros. CA02B01v1 - Beton simplu turnat in egalizari, pante, sape la inaltimi pana la 35 M inaltime beton turnat in straturi mai mic de 3-5 CM transportat cu roaba pe distanta de 30 M CZ0105B1 - Beton marca B 150, cu agregate grele, sortate cu granulatia pana la 16 MM (pentru beton simplu sau armat in placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2?3 nivele si deschideri sub 5 M), preparat cu ciment M 30 in instalatii necentralizate ; TRA01A15 - Transportul rutier al materialelor,semifabricatelor cu autobasculanta pe dist.= 15 km. $ TRA02A15 - Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= 15 km. $

Upload: discom-stan

Post on 12-Jul-2016

218 views

Category:

Documents


2 download

DESCRIPTION

LISTA CANTITATI

TRANSCRIPT

Page 1: 1 01 Reparatii Cabine f3 Lista Cantitati

SECTIUNEA TEHNICA SECTIUNEA FINANCIARA

Nr. Capitol de lucrari U.M. Cantitatea

0 1 2 3 4

1 mp 60.00 33.01

material: 23.47

manopera: 9.35

utilaj: 0.19

transport: 0.00

1.1 ora 0.24 48.00

1.2 kg 324.00 4.10

2 MP 65.00 72.94

material: 62.49

manopera: 10.45

utilaj: 0.00

transport: 0.00

2.1 MP 68.25 0.00

2.2 BUCATA 84.50 2.25

2.3 mp 68.25 3.64

2.4 mp 66.95 12.05

3 mp 65.00 2.18

material: 0.00

manopera: 2.18

utilaj: 0.00

transport: 0.00

4 mc 2.42 258.32

material: 232.41

manopera: 12.43

utilaj: 13.48

transport: 0.00

5 tona 4.91 9.75

material: 0.00

manopera: 0.00

utilaj: 0.00

transport: 9.75

6 tona 2.00 12.75

material: 0.00

manopera: 0.00

utilaj: 0.00

transport: 12.75

TOTAL 1 (Cheltuieli directe)

Greutate Materiale (tone) Ore Manopera Material Manopera Utilaj Transport

Formular F3Lista cu cantitati de lucrari pe categorii de lucrari

Pretul unitar(fara TVA)

- Lei -

CF07B# - Tencuieli interioare,subtiri (1CM), tinci, exec manual

3817 - Malaxor pt.mortar,actionat electric,200 L

500007171 - Tinci pe baza de var-ciment

NLTS02A - Tavane suspendate,OSB,1X12.5MM, mont.pe schelet metalic de sustinere suspend.elem.tip nonius

7801675 - Placa osb

8658134 - Element sup.de suspendare+ancora cd-nonius

7800027 - Plasa din fibra de sticla

2602345 - Placa polistiren extrudat at-N5 2 MM.gros.

CA02B01v1 - Beton simplu turnat in egalizari, pante, sape la inaltimi pana la 35 M inaltime beton turnat in straturi mai mic de 3-5 CM transportat cu roaba pe distanta de 30 M

CZ0105B1 - Beton marca B 150, cu agregate grele, sortate cu granulatia pana la 16 MM (pentru beton simplu sau armat in placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2?3 nivele si deschideri sub 5 M), preparat cu ciment M 30 in instalatii necentralizate ;

TRA01A15 - Transportul rutier al materialelor,semifabricatelor cu autobasculanta pe dist.= 15 km. $

TRA02A15 - Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= 15 km. $

Page 2: 1 01 Reparatii Cabine f3 Lista Cantitati

7.65 128.39 6,031.96 1,412.25 44.12 73.37

Alte cheltuieli directe

CAS 15.80 % 0.00 223.14 0.00 0.00

CASS 5.20 % 0.00 73.44 0.00 0.00

Somaj 0.50 % 0.00 7.06 0.00 0.00

Fond de risc 0.28 % 0.00 3.95 0.00 0.00

Fond de garantare 0.25 % 0.00 3.53 0.00 0.00

Concedii si indemnizatii 0.85 % 0.00 12.00 0.00 0.00

T2 = T1 + Alte cheltuieli directe 6,031.96 1,735.37 44.12 73.37

Cheltuieli indirecte

Cheltuieli indirecte 7.50 % 452.40 130.15 3.31 5.50

T3 = T2 + Cheltuieli indirecte 6,484.36 1,865.52 47.43 78.88

Beneficiu

Profit 5.00 % 324.22 93.28 2.37 3.94

T4 = T3 + Beneficiu 6,808.58 1,958.80 49.81 82.82

TOTAL GENERAL (fara TVA) 8,900.00

Page 3: 1 01 Reparatii Cabine f3 Lista Cantitati

SECTIUNEA FINANCIARA

5 = 3 x 4

1,980.44

1,407.92

561.00

11.52

0.00

11.52

1,328.40

4,741.05

4,061.80

679.25

0.00

0.00

0.00

190.12

248.22

806.44

141.93

0.00

141.93

0.00

0.00

624.92

562.25

30.07

32.60

0.00

47.87

0.00

0.00

0.00

47.87

25.50

0.00

0.00

0.00

25.50

TOTAL

Lista cu cantitati de lucrari pe categorii de lucrari

TOTALUL(fara TVA)

- Lei -

Page 4: 1 01 Reparatii Cabine f3 Lista Cantitati

7,561.71

223.14

73.44

7.06

3.95

3.53

12.00

7,884.83

591.36

8,476.19

423.81

8,900.00

8,900.00